| Head gable extention Molenhoek |
|
|
|
|
Greenhouse de Molenhoek in Bemmel expanded this summer their production capacity with 4 HA. This expansion was done by moving the head gable. The existing ATC ( Automatic Transport Cart) has been relocated to the new head gable. Besides the expansion of the production area of the greenhouse we also build a new work area with an expansion of the shipping lines as well as a completely new staking line. This staking line creates a continues supply of plants in trays to be staked as well as a new fully automated labor registration system. Also one of the existing TTA put down robots has been equipped with separate spacing forks. It is now possible with the push of a button to change the pot pattern in the bench. |






